Clerk of Works
We can review drawings provided by your contractor during any contractor design items and check that the project is still being delivered in accordance with your specification.
An efficient and comprehensive service
Our expertise:
- Basements and deep excavations
- Basement construction method statements (CMS) and Basement impact assessments
- Historical and Listed building strengthening and alterations
- Steelwork connection design
- Temporary works design

See our clerk of work projects
Park Hotel Teddington
KTA were engaged by the client to survey the existing building and provide advice regarding the proposed internal structural wall reconfiguration to allow for the clients modernisation plans for the listed building.
Brewery Tap Ware
KTA provided the structural design from scheme stage through to construction of the steel framing, ground slab and foundations for this mixed use commercial and office scheme on a brownfield site to provide flexible open plan spaces over two floors.
Peasmarsh
KTA provided the structural design from scheme stage through to construction of the steel framing, ground slab and foundations for this mixed use commercial and office scheme on a brownfield site to provide flexible open plan spaces over two floors.