Marlie Farm Holiday Park

Project Details
KTA provided structural engineering design service from scheme design through to construction for this refurbishment project to deliver the reconfigured clubhouse building with large open plan reception, bar and function room space. This was achieved using a new simple steel frame on isolated concrete foundations to maintain cost efficiency for the project. KTA were later engaged for phase 2 of this project to deliver the structural details for the new pool house. KTA provided the foundation investigation works, the main steel frame foundation and pool area ground floor slab design up to construction.
Project Challenges
Adapting the existing structure to fit in with the client brief to create an open clubhouse floor area.
Client:
Park Holidays
Location:
Kent
Procurement:
Design and Build